Think you've seen major capex cycles before? Wait until the chip architecture shift hits harder. Once NVDA transitions to 800-volt DC power systems, we're talking about a wave of data center component obsolescence that'll reshape the entire infrastructure spending landscape. Cooling systems, power distribution units, and legacy hardware stacks—basically everything designed around current voltage standards will need a complete overhaul. That's not just an upgrade cycle, that's a fundamental infrastructure reset with massive capital implications for the industry.
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
Think you've seen major capex cycles before? Wait until the chip architecture shift hits harder. Once NVDA transitions to 800-volt DC power systems, we're talking about a wave of data center component obsolescence that'll reshape the entire infrastructure spending landscape. Cooling systems, power distribution units, and legacy hardware stacks—basically everything designed around current voltage standards will need a complete overhaul. That's not just an upgrade cycle, that's a fundamental infrastructure reset with massive capital implications for the industry.